Portfolio of What We’ve Done

Selected projects demonstrating technical execution, regulatory compliance, and delivery excellence

Untitled design (7)

Brooklyn, NY

Gymnasium and yoga studio where mechanical and electrical design services were provided for the renovation of a first floor tenant space with VRF systems

5

416 Ocean Ave, Brooklyn, NY

Construction administration services and Design of the replacement of the existing 2 pipe steam boiler system with a new energy-efficient system and dedicated domestic hard water heaters. The design included the replacement of an existing chimney and the analysis of the existing gas service for the suitability of the new boiler. Registration of the decommissioning of the existing fuel oil tank was also included in the scope of the work 

4

914 President St. Brooklyn NY

Consulting engineering and design services for the renovation of A 5 story townhouse. Design services included mechanical electrical plumbing and Fire Protection engineering.

3

670 West End Ave. New York, NY

Preparation of a feasibility study for the replacement of the existing oil-fired heating system with alternatives that included gas solutions, electric solutions, and hybrids. Review of the Carbon footprint generated by each of these solutions in comparison to the emissions limit of local law 97

2

870 5th Ave, NY, NY

Consulting engineering services for the preparation of local law 87 submissions to the New York City Department of Buildings, ll97 analysis, design, and replacement of two existing air conditioning systems with the dedicated outside air systems and energy recovery ventilators.

1

Commonpoint 82-32 Parsons Blvd, Queens NY

Consulting engineering and construction administration services for mechanical electrical plumbing and Fire Protection systems for the first floor renovation of a historical building to include a Community Center and other educational spaces

0e198509-4dd4-4386-9612-2f723ff7ce63

Forensic, Legal And Subject Matter Expertise

Multiple legal and forensics assignments, including:

  • Subject matter expert work for a compliance case in the Bronx
  • Third-party subject matter expert work for the mitigation of a septic system in Queens.
  • Subject matter expert work for pipe failure analysis for a hotel project in midtown Manhattan
  • Subject matter expert work for a code review and analysis for a property in Salem, MA
  • Technical review and analysis of the size and capacity of an existing cooling system for a multifamily condominium on the Upper East Side

Multiple reviews and replacements of existing cooling towers, including: A district attorney's office in the Bronx, design of the replacement of an existing open cooling tower with a closed cell evaporative cooler. Capacity analysis of multiple cooling towers for a large building on 9th Ave. Two cooling towers were studied, both of which provide condenser water to existing retail spaces. Design of the replacement of the cooling tower for a building on Lexington Ave. Design of the replacement of the cooling tower for a building on 7th Ave. All cooling tower design projects involve the review and analysis of the existing condenser water pumps for capacity as well as the existing piping for service life.

4

Multiple engagements with the NYC DEP and other utilities for: Backflow preventers, Industrial waste applications, Storm water detention, Bureau of air resources

Multiple assignments and familiarity with local and state governmental agencies: NYC DDC, NYC DCAS, NYC DEP, NYC SCA, DASNY, NYS OGS, NYC MTA, Metro North

10

Multiple tenant fitout projects

18 East 48th Street, 18th through 23rd floors, MEP/FP upgrade and tenant fitout projects, 150 W 22nd 9th floor tenant fitout, Furniture Showroom on first floor at Madison and 29th Street, 155 Avenue of the Americas, 8th Floor tenant fitout, 34 East 61 Street office renovation, 805 3rd Ave law office

9

Multiple assignments or medical occupancies

NY Presbyterian / Lawrence Hospital, NYU Langone

8

Multiple assignments for emergency and optional standby generators and fuel oil/gas systems

generator legalizations in Manhattan and Staten Island, microturbines design on 47th street, Hillside Queens generator with air-cooled remote radiator, NYC Bronx Zoo quarantine facility, Outdoor generators for whole-house applications in the mid-Hudson valley

7

3 E 95th St., New York, NY

Mechanical, electrical, and plumbing design modifications to the existing duplex apartment. Modifications included the relocation of existing fan coil units, calculation, and preparation of an electrical load letter, review, and coordination with the building engineer, and site construction reviews

6

Morningside Park, Bronx, NY

Mechanical, electrical, and plumbing engineering design and construction services for the construction of a kiosk located at Morningside Park. The scope of work included upgrading the domestic water services to include a full service cooking kitchen, filing such requirements for industrial waste and RPZ with the New York City Department of Environmental Protection

Untitled design (3)

the Butcher's Daughters Restaurant

On Kenmare street provided mechanical, electrical, plumbing, and Fire Protection engineering services for the renovation of a restaurant.

2

1400 5th Ave, Bronx, NY

Provided mechanical, electrical plumbing and Fire Protection engineering services for various projects, including the geothermal system renovation and modifications; peer review consulting services; design modifications to gas piping systems; and condenser water system study

1725 York Ave. New York NY

Design of a replacement for the HVAC, electrical, and plumbing systems for the tennis bubble. The design included the replacement of the stormwater system with a siphonic drainage system, an optional standby generator to maintain inflation, and HVAC systems to environmentally condition the space.

5